Fast Tracks

Model Railroading Discussion Forums

Return To The Fast Tracks Website

The Fast Tracks discussion forums have been closed. Click Here for more information.

It is currently Tue Mar 19, 2024 12:49 am

All times are UTC - 5 hours [ DST ]




Forum locked This topic is locked, you cannot edit posts or make further replies.  [ 4 posts ] 
Author Message
PostPosted: Thu Jun 24, 2010 10:35 pm 
Offline

Joined: Wed Jun 16, 2010 10:49 pm
Posts: 13
Hey,

Hoping your father's day was as fun as mine, I broke out the switch fixtures Santa brought me for Christmas. Man, this is the best stuff since sliced bread... better.

The first z scale #6 R turnout was about six hours in the making. Don't laugh, I was trying to be methodical. Going slowly, I watched a step of the video and then performed the procedure--watch the video do a step. What fun, however; I was up until 3:00 am. Although I've had soldering classes in the Army, technique was more of the focus of the first switch.

(!empty($user->lang['ATTACHMENT'])) ? $user->lang['ATTACHMENT'] : ucwords(strtolower(str_replace('_', ' ', 'ATTACHMENT'))):
DSCF3559.JPG
DSCF3559.JPG [ 752.24 KiB | Viewed 9944 times ]


(!empty($user->lang['ATTACHMENT'])) ? $user->lang['ATTACHMENT'] : ucwords(strtolower(str_replace('_', ' ', 'ATTACHMENT'))):
DSCF3563.JPG
DSCF3563.JPG [ 759 KiB | Viewed 9944 times ]


The second one, a left, went better, but I still for got to file the first wing rail before it was laid down. Not too shabby and a whole lotta fun.

By the third one, I had the hang of using the fixture. I also did better at bending the guard rails and diverging rail. the wing rails went better too as the Z fixture doesn't have the tic marks for the location of the "nip" of rail to remove for the wing rail formation.

(!empty($user->lang['ATTACHMENT'])) ? $user->lang['ATTACHMENT'] : ucwords(strtolower(str_replace('_', ' ', 'ATTACHMENT'))):
DSCF3571.JPG
DSCF3571.JPG [ 526.8 KiB | Viewed 9944 times ]


(that's the tip of my $7 radio shack iron)

On this construction I did push the wing rails outboard as Tim says in the video, and the guard rails too. I didn't , however; insert the frog deep enough (that's what she said) and it can be seen clearly in the super macro photo.

(!empty($user->lang['ATTACHMENT'])) ? $user->lang['ATTACHMENT'] : ucwords(strtolower(str_replace('_', ' ', 'ATTACHMENT'))):
DSCF3568.JPG
DSCF3568.JPG [ 427.03 KiB | Viewed 9944 times ]


Well, let's see what kinda damage I can do this weekend...

FT

_________________
~Its your train Jesse, rob it how ya want~


Top
 Profile  
 
PostPosted: Tue Jun 29, 2010 1:02 pm 
Offline
Site Admin

Joined: Fri May 07, 2004 11:22 pm
Posts: 311
Location: Port Dover, Ontario
Looking good!

Keep us posted on your progress...

_________________
Cheers!

Tim Warris
Fast Tracks
http://www.fast-tracks.net
service@fast-tracks.net


Top
 Profile  
 
PostPosted: Tue Jun 29, 2010 10:12 pm 
Offline
User avatar

Joined: Tue Jan 26, 2010 8:35 pm
Posts: 29
Location: Indiana
Thanks for posting the pictures of your turnouts. I see that you are checking using a 2 axle truck. I did the same thing on the first couple of turnouts I built in N Scale. I found out that the 2 axle truck was just not spec wise tight enough to show up some of my shortcomings on my first turnouts. After the first turnout I progressed to 3 axle truck and finally started using a stripped down(I took all the gearing and side rods off so wheels would turn freely), old 2-8-2 steam engine for checking my work. That did help me to improve my work somewhat. At least I could get most of my locos through the turnouts without bobbles and/or derails. On about turnout number 4 I religiously started using the NMRA N Scale gauge to check my work as I progressed through the assembly steps on my turnouts. This in conjunction with the longer base wheel sets really helped me to build turnouts that really worked smooth with my locos that had longer wheel bases. I have some articulated steam engines and they just would not go through some of my turnouts until I started checking my assembly steps with the NMRA gauge and a long wheel base truck.

I really admire your soldering techniques on something that small. Looks good.

Inprinter

_________________
If the light at the end of the tunnel doesn't stay at the end of the tunnel, then it is time to beat a path in the opposite direction.


Top
 Profile  
 
PostPosted: Thu Jul 01, 2010 11:21 pm 
Offline

Joined: Wed Jun 16, 2010 10:49 pm
Posts: 13
Many Happy Thank Yous Gentlemen,

And thanks for the helpful tips too. (wishing I had some heavy MOW equipment)

Thanks again, and HAPPY Independence Day.

FT

_________________
~Its your train Jesse, rob it how ya want~


Top
 Profile  
 
Display posts from previous:  Sort by  
Forum locked This topic is locked, you cannot edit posts or make further replies.  [ 4 posts ] 

All times are UTC - 5 hours [ DST ]


Who is online

Users browsing this forum: No registered users and 0 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
cron
Powered by phpBB® Forum Software © phpBB Group