Here is an update to the building of this crossover. I built up the tie system for the crossover using the Quicksticks Single Crossovers last evening and the photo shows the results of that effort. Tonight I have built up the approaching tracks on either side in preparation for actually drilling the slots for the throwrod of the Tortoise machines I will be using to operate the crossovers which will be followed by installing the crossovers by spiking the assembly down.
Attachments: |
File comment: Crossover network shown with crossover in place but not spiked down.
Mavica Disk 4 110.jpg [ 556.6 KiB | Viewed 7455 times ]
|
|