Fast Tracks
http://fast-tracks.net/forums/

Replacing/ redoing my track work
http://fast-tracks.net/forums/viewtopic.php?f=5&t=1071
Page 2 of 2

Author:  Airwolf Crazy [ Thu Sep 09, 2010 8:05 am ]
Post subject:  Re: Replacing/ redoing my track work

Thanks Chris! I have not posted anything in sometime due to family trips over the summer. I have completed the track work shown above and have continued around the end by the wall. The layout has a optional loop for continous running when operating sessions are not being done. This loop is nearly complete so I can once again run trains while I continue the remaining work.

Christopher

Page 2 of 2 All times are UTC - 5 hours [ DST ]
Powered by phpBB® Forum Software © phpBB Group
https://www.phpbb.com/