Fast Tracks http://fast-tracks.net/forums/ |
|
Point hinges http://fast-tracks.net/forums/viewtopic.php?f=4&t=952 |
Page 1 of 1 |
Author: | Tom Tomasik [ Thu Dec 04, 2008 9:14 pm ] |
Post subject: | Point hinges |
I recall seeing a thread with photos regarding a method of making point hinges with rail joiners. I can not seem to be able to find it, even using the search feature of the board. Does anyone recall where that post is? |
Author: | oldsnowtop1 [ Thu Dec 04, 2008 10:30 pm ] |
Post subject: | Re: Point hinges |
TT, There is reference to this in the Fast Tracks Construction Article for three way switches. Go to their Document Library and review UG06, Constructing Three Way Turnouts, pps. 26, etc. Chuck Lobaugh |
Page 1 of 1 | All times are UTC - 5 hours [ DST ] |
Powered by phpBB® Forum Software © phpBB Group https://www.phpbb.com/ |