[phpBB Debug] PHP Warning: in file [ROOT]/includes/bbcode.php on line 112: preg_replace(): The /e modifier is no longer supported, use preg_replace_callback instead
[phpBB Debug] PHP Warning: in file [ROOT]/includes/bbcode.php on line 112: preg_replace(): The /e modifier is no longer supported, use preg_replace_callback instead
[phpBB Debug] PHP Warning: in file [ROOT]/includes/bbcode.php on line 112: preg_replace(): The /e modifier is no longer supported, use preg_replace_callback instead
[phpBB Debug] PHP Warning: in file [ROOT]/includes/bbcode.php on line 112: preg_replace(): The /e modifier is no longer supported, use preg_replace_callback instead
Fast Tracks • View topic - Railbender

Fast Tracks

Model Railroading Discussion Forums

Return To The Fast Tracks Website

The Fast Tracks discussion forums have been closed. Click Here for more information.

It is currently Mon May 13, 2024 7:20 pm

All times are UTC - 5 hours [ DST ]




Forum locked This topic is locked, you cannot edit posts or make further replies.  [ 5 posts ] 
Author Message
 Post subject: Railbender
PostPosted: Tue Aug 02, 2005 4:32 pm 
Offline

Joined: Tue Aug 02, 2005 7:34 am
Posts: 21


Top
 Profile  
 
 Post subject:
PostPosted: Wed Aug 03, 2005 10:16 pm 
Offline
Site Admin

Joined: Fri May 07, 2004 11:22 pm
Posts: 311
Location: Port Dover, Ontario

_________________
Cheers!

Tim Warris
Fast Tracks
http://www.fast-tracks.net
service@fast-tracks.net


Top
 Profile  
 
PostPosted: Thu Aug 04, 2005 12:31 am 
Offline

Joined: Tue Aug 02, 2005 7:34 am
Posts: 21


Top
 Profile  
 
PostPosted: Thu Aug 04, 2005 8:23 am 
Offline

Joined: Tue Aug 02, 2005 7:34 am
Posts: 21


Top
 Profile  
 
PostPosted: Sat Aug 20, 2005 2:07 am 
[quote="kleaverjr"]... The prototype uses degrees to calculate the radius of their curves somehow (I still don't understand that myself how that works!) ...

Ken, et al,

Actually, "radius" is mostly a modelling thing. Most twelve-inch-to-the-foot railroads aren't drawn up using turn radii because (a) the radius changes as the track eases into the turn (easements) and (b) the "center" of the hypothetical circle would be too far away, and probably too inaccessible to do any kind of arc scribing. Imagine trying to pound a stake into solid rock 1000 feet into a mountain to get that 1000 foot radius turn in a narrow gorge. ;-)

What really happened was that surveyors would measure curves in "degrees per chain." A chain is a surveyor's tool -- quite literally a chain 66 feet long (ever wonder why an acre is the size it is? 2 chains x 5 chains = 1 acre) and the surveyor would have his assistant pull the chain tight to 66 feet "straight ahead." Looking through his transit (a small scope with a compass beneath it,) he would then have the assistant go a set number of degrees to the left or right of the point and drive a stake. Curves along the Right of Way might start out at some fraction of degree per chain, and get progressively tighter, say to two or three degrees per chain, and then ease back out to straight on the other end of the turn. The advantage here is that if you knew you had to make 30 degrees of turn, you could spread that out over a certain number of chains without needing much more than the transit and chain.


Attachments:
Surveyor'sChain.jpg
Surveyor'sChain.jpg [ 27.55 KiB | Viewed 6602 times ]
Top
  
 
Display posts from previous:  Sort by  
Forum locked This topic is locked, you cannot edit posts or make further replies.  [ 5 posts ] 

All times are UTC - 5 hours [ DST ]


Who is online

Users browsing this forum: No registered users and 16 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
cron
Powered by phpBB® Forum Software © phpBB Group