Fast Tracks

Model Railroading Discussion Forums

Return To The Fast Tracks Website

The Fast Tracks discussion forums have been closed. Click Here for more information.

It is currently Fri Apr 19, 2024 6:15 pm

All times are UTC - 5 hours [ DST ]




Forum locked This topic is locked, you cannot edit posts or make further replies.  [ 3 posts ] 
Author Message
PostPosted: Sun Jan 30, 2011 1:08 pm 
Offline
User avatar

Joined: Sun Feb 07, 2010 4:13 pm
Posts: 9
Location: Indiana
I need to build a 75 degree crossing based on 2 24" radius curves crossing.
I just need one of these. I'm getting better at switch building (built about 10 now) so I'm hopeful I can do this.
I downloaded the templates for 90deg and 60deg.
I also watched the videos.

My question is, what would be the prefered method of creating the outside track around the bends ?
These are very sharp bends so I dont know if I can clip and bend a continous rail.
So should I instead file 2 rail ends to the right angle and solder them ? or is there a way to bend rail at a 75deg angle ?
I have the basic tools (pointform, stock helper) and 2 fixtures for switches but nothing quite like this.

The other question is should I build the crossing first then put it in place and connect up the leading lines ?
Or I had another idea. That is build the 2 crossing curves fully (I have PCB ties and the curved fixtures) ,
then overlay them and cut the rails where they intersect ? Then fill in loose rail where needed (the guard rails etc).



Suggestions welcome.


Top
 Profile  
 
PostPosted: Mon Jan 31, 2011 9:43 am 
Offline
User avatar

Joined: Sat Aug 13, 2005 10:48 am
Posts: 365
Location: East Texas - USA
Look through the following link:

http://www.westportterminal.de/howtoscrcrossings.html

Custom, hand laid crossings are an art from. I've done several - but each one was created differently. Some fully curved crossings were done piece by piece. I've also done continuous rail one route with a butted joint and then fitted the crossing pieces.

Experiment with some materials, you'll find what approach works for you.

-ed-

_________________
-ed mccamey-
COSLAR RR - http://www.coslar.us/
NMRA Standards and Conformance Department
PROTO & FINE Scale Coordinator
I estimate I have about 5 pounds of coupler springs somewhere in the vicinity of my workbench.


Top
 Profile  
 
PostPosted: Mon Jan 31, 2011 8:30 pm 
Offline
User avatar

Joined: Sun Feb 07, 2010 4:13 pm
Posts: 9
Location: Indiana
Thank you your page is exactly what I was looking for !


Top
 Profile  
 
Display posts from previous:  Sort by  
Forum locked This topic is locked, you cannot edit posts or make further replies.  [ 3 posts ] 

All times are UTC - 5 hours [ DST ]


Who is online

Users browsing this forum: No registered users and 16 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
cron
Powered by phpBB® Forum Software © phpBB Group