 Post subject: 1:9 crossing in code 40
PostPosted: Mon Feb 18, 2013 7:35 am 
Offline
User avatar

Joined: Sun Sep 19, 2010 6:05 am
Posts: 51
Location: Rotterdam
Image
01-Settinp up the scheme for the crossing. I first put down the toprail and after that lined up a 1:9 point template over the lines

Image
02-One step is skipped here, namely the placing of the full point templates. This was done prior to this. After I had lined up the point templates I removed them and cut them to size to just no overlap

Image
03-I sprayed the template with 3M "Post-it" glue on a copy of the original template. Use a sheet of paper next to the crossing template to catch the overspray. Otherwise you will be working constantly with your hands sticking to the paper

Image
04-The left half of the sleepers in place

Image
05-The right side still needs doing. The darker marked sleepers are additional sleeper. Those are missing on the 1:9 point as well. Given the thin rails I prefer to have a bit more body at those locations

Image
06-The template provided with slepers

Image
07-For ease of builing and lining up I put down a through going rail at first, this will later be replaced

Image
08-I used the 1:9 point jig for the various bends. In the jig it is easier to rightly align the rail. FT advices to remove the feet of the rail. This might be usefull in scale bigger then N, but in N the feet of the rail is 1,2 mm wide, so I have found no need for thinning the railfoot

Image
09-Detailed shoot of the bend rail

Image
10-Everything kept in place with various jigs. The FastTrack filing aids are great for weighing down :)

_________________
Paul Bender

Everybody can shovel, firing is an art

Image
Firing this train was more fun then hard labor :-) © R. de Water


Top
 Profile  
 
PostPosted: Mon Feb 18, 2013 7:37 am 
Offline
User avatar

Joined: Sun Sep 19, 2010 6:05 am
Posts: 51
Location: Rotterdam
Image
11-The first (straight) rail on its final place

Image
12-The crossing rail on its place

Image
13-Not the best picture but building is more important / fun then taking pictures. The first frog

Image
14-The various bits kept in place with various jigs

Image
15-Stage 1 done. The frog can assist in putting the toprail in its final position after removing

Image
16-The first inner rail in its place with jigs

Image
17-And fixed in position

Image
18-The toprail taken out, it has performed its function.

Image
19-Again not the best picture, but the bend toprail and kept in position with jigs

Image
20-Thanks to Facebook for turning this picture :? but you can see the intention. The "Stock-aid" performs as a jig for keeping the crossing rail straight during soldering

_________________
Paul Bender

Everybody can shovel, firing is an art

Image
Firing this train was more fun then hard labor :-) © R. de Water


Last edited by P Bender on Mon Feb 18, 2013 1:06 pm, edited 1 time in total.

Top
 Profile  
 
PostPosted: Mon Feb 18, 2013 1:05 pm 
Offline
User avatar

Joined: Sun Sep 19, 2010 6:05 am
Posts: 51
Location: Rotterdam
Image
21-Both outer rails of the crossing in place

Image
22-A close up of the top rail

Image
23-The second (left) innerrail ready for soldering

Image
24-Leftside done (except for the guardrails)

Image
25-Continiuing on the right side

Image
26-The righthand frog ready to be put in place

Image
27-The various jigs to keep the frograil in place

Image
28-With this as result

Image
29-The righthand inner rails

Image
30-The first rail in place

_________________
Paul Bender

Everybody can shovel, firing is an art

Image
Firing this train was more fun then hard labor :-) © R. de Water


Top
 Profile  
 
PostPosted: Mon Feb 18, 2013 1:12 pm 
Offline
User avatar

Joined: Sun Sep 19, 2010 6:05 am
Posts: 51
Location: Rotterdam
Image
31-Again thanks to FB for turning this picture, but the righthandside is done as well

Image
32-the first try to get the flange opening to the required width. From the 1:6 half slip I know that was not likely to going to work. However for minimal alteration this is an easy way of getting the required width. The blades of a junior saw are just 0.7 mm over the teeth or exactly the required NMRA width for N-scale

Image
33-All guardrails prepared

Image
34-Lefthand guardrails in place. Oops, I have beveled the guardrail on the frog the wrong way around :oops:

Image
35-Righthand guardrails in place

Image
36-Center guardrails in place

Image
37-And the crossing is almost done, or at least can be taken from the template

Image
38-The crossing taken from the template. This is very simple with the 3M "Post-it" sprayed on the template. The glue is firm enough to keep the ties in place during the builiding proces. I have not yet tried if the template is even reuseable, even if it aint .......

Image
39-The ties cut to length

Image
40-close-up of the left side of the crossing

_________________
Paul Bender

Everybody can shovel, firing is an art

Image
Firing this train was more fun then hard labor :-) © R. de Water


Top
 Profile  
 
PostPosted: Mon Feb 18, 2013 1:25 pm 
Offline
User avatar

Joined: Sun Sep 19, 2010 6:05 am
Posts: 51
Location: Rotterdam
Image
41-Close-up of the crossingcentre

Image
42-Close-up of the righthandside. Als not in focus, but so be it for now

Image
43-The two points are build with the FT jig and my first freehand build bit of track: a 1:9 crossing. I have not paid to much attention to the fine details. The main question was: can it be done and will it be a runner. The answer to both question is YES :P

The next BIG question is.............. Am I going to build a half slip in 1:9? by the looks of it FT does not have a jig for that :?

Watch this space 8)

_________________
Paul Bender

Everybody can shovel, firing is an art

Image
Firing this train was more fun then hard labor :-) © R. de Water


Top
 Profile  
 
PostPosted: Tue Feb 19, 2013 8:50 pm 
Offline

Joined: Tue Nov 24, 2009 6:59 pm
Posts: 40
Greetings,
What a nice piece of work!
Christopher


Top
 Profile  
 
Display posts from previous:  Sort by  
Forum locked This topic is locked, you cannot edit posts or make further replies.  [ 6 posts ] 

All times are UTC - 5 hours [ DST ]


Who is online

Users browsing this forum: No registered users and 1 guest


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
Powered by phpBB® Forum Software © phpBB Group