Fast Tracks http://fast-tracks.net/forums/ |
|
Fifteen 90 degree crossings http://fast-tracks.net/forums/viewtopic.php?f=15&t=1134 |
Page 1 of 1 |
Author: | DKlemm [ Mon Sep 06, 2010 7:36 pm ] | ||
Post subject: | Fifteen 90 degree crossings | ||
The 15 diamonds are modeled after an area in Decatur Il. The IC had 3 tracks that crossed the Wabash 5 tracks. The photo was taken after I painted the rails and ties and laid down the ballast. Next up is to start laying the Wabash tracks. This was my first track building adventure and the jig was great. David
|
Author: | emccamey [ Mon Sep 06, 2010 8:46 pm ] |
Post subject: | Re: Fifteen 90 degree crossings |
My - fine construction, congratulations. The only thing that could be more impressive would be ninety 15 degree crossings ! -ed- |
Page 1 of 1 | All times are UTC - 5 hours [ DST ] |
Powered by phpBB® Forum Software © phpBB Group https://www.phpbb.com/ |